- Burley Brampton on grey/green slate. To be plastered by customer.
- First fire in a Burley Brampton
- Chinese stove in fireplace prepared by customer
- Morso Squirel
- Sandstone cut and ready to lay on a bed of mortar
- Hearth laid and Mendip Loxton 5 installed.
- Burley Holleywell
- Saltfire ST2, fireplace prepared by customer.
- 🙁
- Vented closure plate fitted in bedroom.
- It’s got to come off!
- Shaun and the little breaker
- Bagging up the rubble.
- Recess cleared and bricks cleaned
- End of first day.
- Plastered and dark grey slate fitted.
- Contura i5L installed.
- A nicely fitted fireplace, it’s coming off.
- Wooden surround removed
- Shaun and the big breaker.
- Me and the little breaker. This fireplace was very hard to breakout, I damaged my elbow from all the vibration.
- Re-pointing the bricks. some of the bricks needed to be replaced.
- Boarding the sides as the bricks at the side were beyond saving.
- Making preparations for the closure plate.
- Waiting for the hearth.
- Mendip Churchill 5 on dark grey slate.
- Ceiling cut out, joists strapped and cut.
- Joist straps, upper vented firestop plate and supports.
- Down through the roof.
- It was quite unpleasant working in such a tight, precarious space.
- Black vented firestop plate.
- A heat shield I made out of steel on site so the customer could keep the wooden rail. Without a heat shield it would be too close to the stove and pipe and could combust.
- Black Dinak system.
- Victoria Nero Lux on slate.